Follow the rules of building regulation                Pay tax regularly                Keep Your Town Clean                Prevent the Wastage of Water                Put Solid Waste at the Particular Place                Entry the new born Child                Plant more Tree and make sound the Environment                Emergency Contact: Fax 08626-71250, Phone: 0862671250/0862672092                E-mail Address: sreemangalmunicipality@gmail.com/sreemangalmunicipality@yahoo.com               
Developments Works
Displaying 1-3 of 3 result(s).
নগর পরিচালন উন্নতিকরণ কর্মসূচী (UGIAP: Phase -II)

# নাগরিক সচেতনতা ও তাদের অংশগ্রহণ (Citizen Awareness and Participation) 
# নগর পরিকল্পনা (Urban Planning) 
# মহিলাদের অংশ গ্রহণ (Women Participation) 
# শহুরে দরিদ্র জনগোষ্ঠীকে একত্রিকরণ (Integration of Urban Poor) 
# আর্থিক দায়বদ্ধতা এবং স্থায়িত্বশীলতা (Financial Accountability and Sustainability) 
# প্রশাসনিক স্বচ্ছতা (Administrative Transparency)  

 

 
Details of Existing/Recent Past Development Projects Implemented by the Pourashava

  Sreemongal is an old and well developed Pourashava and total agricultural land within the Pourashava is only 5.02%. But Sreemongal Pourashava is small in size. Its revenue income is not enough to convey all the expenditure of development works within the Pourashava. So Pourashava is very much dependent on the Government grants and other development funds and loan from organizations like BMDF.

The most important project is the present Project of Cooperative & Local Government Ministry for the preparation of Master Plan up to the year 2031 for Sreemongal Pourashava. It commenced on March 2008 and expected to be completed in 2011. 

Other than this Master plan project under the Upazila Towns Infrastructure Development Project of LGED, there are some other projects. These projects are undertaken through MSU and UGIIP-2 projects of LGED. Physical target of MSU projects within the Pourashava are:

1.   Bituminous carpeting of roads at different locations of the Pourashava.

2.   Brick soling on some portion of roads at different locations

3.   Maintenance and construction of drains within the Pourashava

4.   Construction of guard wall at different roads of the Pourashava

5.   Street lighting for municipal area.

7. A forestation program along the roads.

Again the main vision of UGIIP-2 project is that improvement of urban infrastructure and service delivery can be achieved more effectively by linking with governance reform and creating proper incentive mechanism.

The recent infrastructure development schemes implemented by the Government includes roads, street lights etc.

Upazila Fisheries and Livestock Office distribute fish fry and fertilizers for fish and vaccination of poultry and other livestock to the people with free of cost. They also arrange training session to train up the people.

Upazila Parishad sometimes takes initiatives for forestation and distribution of saplings.

Upazila Health Complex only implements a few activities like vaccination, training on child and mother health etc.

Electrification of Sreemongal is directed by Polli Biddutayan Board (Rural Electrification Board- REB), which has a master plan to avail 100% electrify to whole Upazila including the Pourashava area. The master plan includes priority basis electrification to the residents and the commercial establishments. Main responsibility of DPHE within the Pourashava is to design, implement and maintain the water supply system.

Local Government and Engineering Department (LGED) has an upcoming project of construction of road, culverts and box culverts within the Pourashava.

Development Works work under UGIIP-II

01. Name of works      : Improvement of Guho road by dense bituminous carpeting

                       including divider in the middle of the roads (Ch 0+000 to Ch 0+317m)
Package No                 : UGIIP-II-2/SRIM/UT/01/2011
Name of Contractor      : M/S. Salim Construction, Vanugach Road, Sreemangal, Maulvibazar.
Contract Amount Tk     : 57,63,253.162
Date of Commencement of Work. 12/07/2011
  
02. Name of works      : a) Improvement & Rehabilitation of Purbasha main road by
                                             dense bituminous carpeting at (Ch 0+000 to Ch 0+635m)
                                   b) Improvement of vanugach road to rail gate by dense bituminous 
                                   carpeting at (Ch 0+000 to Ch 0+255m) 
                                   c) Improvement of Central road by CC at (Ch 0+000 to Ch
                                         0+200m)
 
Package No               : UGIIP-II-2/SRIM/UT/02/2011
Name of Contractor      : A.N.T (JV)
Maulvibazar.Contract Amount Tk     : 9771960.57
Date of Commencement of Work. 12/07/2011
 
03.   Name of works
 
  1. Constructions of R.C.C. drain at Hobigoj road south side drain from Central road
            hotel Taz  to Bhurburia chora At Ch 0+00 to Ch+4.47
  1. Constructions of drain Station road fish shed to collage road at Ch0+00 to Ch 0+292
  2. Constructions of drain Moulvibazar road collage road east site to Ahmed traders at Ch 0+00 to Ch 0+ 611
  3. Constructions of R.C.C Drain Vanugash road Railway field to roisuddin filling station at Ch0+00 to Ch 0+216
  4. Constructions of drain Moulvibazar road Chowmohona Nazboding west side at   Ch 0+00 to Ch 0+ 611
  5. Constructions of drain at Dhanshiry road Part-A Mr.Dewan’s house to station road at Ch 0+00 to Ch 0+ 91 Part.B: Mr.Dewan’s house to patakury at Ch 0+00 to Ch 0+52’ Part C: Bhanugach Road to Guho road at Ch 0+00 to Ch0+150
  6. Constructions of drain at jalalia road form Godown no-10 to Kalighat road jorapul at Ch.0+00 to Ch 0+ 635.
  7. Constructions of drain at vanugach road from BGB camp gate to Boddho Bhumi at ch.00+00 to Ch 00+ 200
  8. Constructions of drain at shaplabag road start from Mohabir bania shop to charra at ch.00+00 to 00+254
  9. Constructions of drain at Shagordigi road start (east side) from Lokonath traders to Hobigonj road at ch.00+00 to 00+500m.
Part-B (Solid Waste Management)
 11. Construction the Compost Plat at the existing disposal site of the Pourashava.
       12. Approach road for the compost plant.
       13. U-drain for cross drainage of the approach road. 
 
 02. Package Number      : UGIIP-II-2/SREE/DR/01/2011+UGIIP-II-
                                           2/SRIM/SDM/01/2011
RECENT NEWS
FEATURED PHOTO

২৬মার্চ মহান স্বাধীনতা ও জাতীয় দিবস উদযাপন

জাতির পিতা বঙ্গবন্ধু শেখ মুজিবুর রহমানের ৪৫তম শাহাদাত বার্ষিকী ও জাতীয় শোক দিবস উপলক্ষ্যে বৃক্ষরোপন কর্

FEATURED VIDEO

Tea Garden, Sreemangal, Bangladesh

BEAUTIFUL PLACE

Sreemangal

is the place of tea gardens, hills and forest areas on...Read more...